Faver tunnel
Bypass tunnel in Faver, nat. Road 612 in Val di Cembra
work completed
- Feasibility study not completed
- Initial design not completed
- Final design not completed
- Executive design not completed
- Works management completed
Duration of the works: 2005 - 2010
In 2005, the Province of Trento entrusted Metropolitana Milanese with the works management, measurement operations, accounting and safety coordination in the performance phase of the project to build the tunnel for the bypass of the Faver conurbation along the SS 612 trunk road in Val di Cembra at Trento. Completion of the works is scheduled for 2010.